Service alterations 

See details of routes affected by current service alterations and real time updates

 

Start: 11/10/2008 End: 13/10/2008

Engineering work between Bristol Temple Meads / Chippenham and Westbury from Saturday 11 October until 05:15 Monday 13 October 2008

Routes affected: Bristol Temple Meads, Bath Spa, Bradford-on-Avon & Westbury; also Cardiff Central, Newport, Bristol Temple Meads, Bath Spa, Chippenham, Swindon, Didcot Parkway, Reading, Slough & London Paddington

First Great Western

Buses replace trains between:

  • Bristol Temple Meads and Westbury
  • Swindon to Westbury
  • Swindon and Chippenham
  • Westbury and Cardiff Central

South West Trains

Buses replace trains between Westbury and Bristol Temple Meads

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 11/10/2008 End: 12/10/2008

Engineering work between Southampton Central and Bournemouth on Saturday 11 and Sunday 12 October 2008

Routes affected: London Waterloo, Woking, Winchester, Eastleigh, Southampton Central, Brockenhurst, Christchurch, Bournemouth, Poole, Dorchester & Weymouth; also Birmingham New Street, Leamington Spa, Reading, Basingstoke, Southampton Central & Bournemouth

CrossCountry

Buses replace trains between Southampton Central, Brockenhurst and Bournemouth.

Details of revised services have not yet been confirmed, please check back nearer the time of travel.

South West Trains

Saturday

Buses replace trains between Christchurch and Poole.

Sunday

Buses replace trains between Brockenhurst and Poole.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 12/10/2008 End: 12/10/2008

Engineering work between Guildford and Havant on Sunday 12 October 2008

Routes affected: London Waterloo, Clapham Junction, Surbiton, Woking, Guildford, Haslemere, Havant & Portsmouth Harbour

Until 11:05

Buses replace trains between Guildford and Havant.

After 11:05

Buses replace trains between Haslemere and Havant.

Planning your Journey

To get options for your journey, please use the Journey Planner

 

Start: 12/10/2008 End: 12/10/2008

Engineering work at Bath Spa Station on Sunday 12 October 2008

Routes affected: London Paddington, Reading, Swindon, Bath Spa, Bristol Temple Meads, Taunton & Exeter St Davids; also Cardiff / Gloucester, Bristol Temple Meads, Bath Spa, Westbury & Southampton Central / Weymouth

First Great Western

Buses replace trains between;

  • Bristol Temple Meads and Swindon via Bath Spa
  • Bristol Temple Meads and Westbury via Bath Spa
  • Swindon and Westbury via Melksham

Due to limited road access to Bath Spa station the replacement buses will not serve Bath Spa railway station.

Buses will pick up from a temporary bus station located near the junction of Avon Street and Green Park Road, which is close to the city centre. This is approximately 15 minutes walk from Bath Spa railway station.

Directions to the temporary rail replacement bus station will be published nearer the time.

South West Trains

It is not yet known how South West Trains are affected by this engineering work

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 18/10/2008 End: 19/10/2008

Engineering work at Bath Spa Station on Saturday 18 and Sunday 19 October 2008

Routes affected: London Paddington, Reading, Swindon, Bath Spa, Bristol Temple Meads, Taunton & Exeter St Davids and Cardiff / Gloucester, Bristol Temple Meads, Bath Spa, Westbury & Southampton Central / Weymouth

First Great Western

Buses replace trains between;

  • Bristol Temple Meads and Swindon via Bath Spa
  • Bristol Temple Meads and Westbury via Bath Spa
  • Swindon and Westbury via Melksham

Due to limited road access to Bath Spa station the replacement buses will not serve Bath Spa railway station.

Buses will pick up from a temporary bus station located near the junction of Avon Street and Green Park Road, which is close to the city centre. This is approximately 15 minutes walk from Bath Spa railway station.

Directions to the temporary rail replacement bus station will be published nearer the time.

South West Trains

It is not yet known how South West Trains are affected by this engineering work

Start: 18/10/2008 End: 20/10/2008

Engineering work between Bristol Temple Meads and Chippenham / Westbury from 01:25 Saturday 18 October until 05:15 Monday 20 October 2008

Routes affected: Bristol Temple Meads, Bath Spa, Bradford-on-Avon & Westbury also Bristol Temple Meads, Bath Spa, Chippenham, Didcot Parkway, Reading, Slough & London Paddington

First Great Western

Buses replace trains between:

  • Bristol Temple Meads and Westbury
  • Swindon and Westbury
  • Swindon and Chippenham
  • Westbury and Cardiff Central

South West Trains

Buses replace trains between Bristol Temple Meads and Westbury

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 18/10/2008 End: 19/10/2008

Engineering work between Staines and Windsor & Eton Riverside on Saturday 18 and Sunday 19 October 2008

Routes affected: London Waterloo, Richmond, Feltham, Staines, Wraysbury, Sunnymeads, Datchet & Windsor & Eton Riverside

Buses replace trains between Staines and Windsor & Eton Riverside.

Passengers are advised to allow extra time for their journey. This is because of the need to make a connection at Staines. 

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 25/10/2008 End: 26/10/2008

Engineering work at Bath Spa Station on Saturday 25 and Sunday 26 October 2008

Routes affected: London Paddington, Reading, Swindon, Bath Spa, Bristol Temple Meads, Taunton & Exeter St Davids and Cardiff / Gloucester, Bristol Temple Meads, Bath Spa, Westbury & Southampton Central / Weymouth

First Great Western

Buses replace trains between;

  • Bristol Temple Meads and Swindon via Bath Spa
  • Bristol Temple Meads and Westbury via Bath Spa
  • Swindon and Westbury via Melksham

Due to limited road access to Bath Spa station the replacement buses will not serve Bath Spa railway station.

Buses will pick up from a temporary bus station located near the junction of Avon Street and Green Park Road, which is close to the city centre. This is approximately 15 minutes walk from Bath Spa railway station.

Directions to the temporary rail replacement bus station will be published nearer the time.

South West Trains

It is not yet known how South West Trains are affected by this engineering work

Start: 25/10/2008 End: 27/10/2008

Engineering work between Westbury and Bristol Temple Meads on Saturday 25 until 05:15 on Monday 27 October 2008

Routes affected: Bristol Temple Meads, Bath Spa, Avoncliff, Bradford-upon-Avon, Trowbridge, Westbury, Salisbury, Romsey & Southampton Central; also Cardiff Central, Pilning, Bristol Temple Meads, Oldfield Park, Bath Spa, Avoncliff, Bradford-upon-Avon, Trowbridge, Westbury & Frome; also Bristol Temple Meads, Bath Spa, Swindon, Didcot Parkway, Reading & London Paddington

Buses will replace trains between Westbury and Bristol Temple Meads. Journey times will be extended by up to one hour.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 25/10/2008 End: 26/10/2008

Engineering work between Staines and Windsor & Eton Riverside on Saturday 25 and Sunday 26 October 2008

Routes affected: London Waterloo, Clapham Junction, Putney, Barnes, Richmond, Twickenham, Whitton, Feltham, Ashford, Staines, Wraysbury, Sunnymeads, Datchet & Windsor & Eton Riverside

Buses will replace trains between Staines and Windsor & Eton Riverside. Journey times will be extended by up to 30 minutes.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 27/10/2008 End: 31/10/2008

Engineering work between Newton Abbot and Paignton from 09:00 on Monday 27 until 14:30 on Friday 31 October 2008

Routes affected: Bristol Temple Meads, Taunton, Exeter St Davids, Dawlish, Newton Abbot, Torquay & Paignton; also Salisbury, Gillingham, Yeovil Junction, Exeter Central, Exeter St Davids, Newton Abbot, Torquay & Paignton; also Exmouth, Exeter St Davids, Starcross, Dawlish, Newton Abbot, Torre, Torquay & Paignton

Buses will replace trains between Newton Abbot and Paignton, with journey times extended by up to 45 minutes

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 01/11/2008 End: 02/11/2008

Engineering work between Southampton Central and Brockenhurst on Saturday 1 and Sunday 2 November 2008

Routes affected: London Waterloo, Woking, Winchester, Southampton Airport Parkway, Southampton Central, Brockenhurst, Bournemouth, Poole, Wareham & Weymouth; also Birmingham New Street, Coventry, Banbury, Reading, Southampton Central, Redbridge, Brockenhurst & Bournemouth

South West Trains

Services between London Waterloo and Poole / Weymouth will start / end at Southampton Central

Buses will run between Southampton Airport Parkway and Bournemouth and Southampton Central and Brockenhurst. Journeys will be extended by up to 50 minutes.

Customers travelling to Weymouth are advised to travel to Brockenhurst, then use a train running between Brockenhurst and Weymouth

CrossCountry

Trains will start / end at Southampton Central. Buses replace trains between Southampton Central and Bournemouth

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 01/11/2008 End: 03/11/2008

Engineering work between Bristol Temple Meads / Chippenham and Westbury from 23:45 Saturday 1 November until 05:15 Monday 3 November2008

Routes affected: Cardiff Central, Bristol Temple Meads, Bath Spa / Swindon, Chippenham, Trowbridge, Westbury, Salisbury & Southampton Central

First Great Western

Buses replace trains between:

  • Bristol Temple Meads and Westbury
  • Swindon to Westbury
  • Swindon and Chippenham
  • Westbury and Cardiff Central

South West Trains

Buses replace trains between Westbury and Bristol Temple Meads

Planning Your Journey

To get options for your journey, please use the Journey Planner

Start: 02/11/2008 End: 02/11/2008

Engineering work at Bath Spa Station on Sunday 2 November 2008

Routes affected: London Paddington, Reading, Swindon, Bath Spa, Bristol Temple Meads, Taunton & Exeter St Davids and Cardiff / Gloucester, Bristol Temple Meads, Bath Spa, Westbury & Southampton Central / Weymouth

First Great Western

Buses replace trains between;

  • Bristol Temple Meads and Swindon via Bath Spa
  • Bristol Temple Meads and Westbury via Bath Spa
  • Swindon and Westbury via Melksham

Due to limited road access to Bath Spa station the replacement buses will not serve Bath Spa railway station.

Buses will pick up from a temporary bus station located near the junction of Avon Street and Green Park Road, which is close to the city centre. This is approximately 15 minutes walk from Bath Spa railway station.

Directions to the temporary rail replacement bus station will be published nearer the time.

South West Trains

It is not yet known how South West Trains are affected by this engineering work

Start: 02/11/2008 End: 02/11/2008

Engineering work between Whitton / Hounslow and Ascot / Chertsey / Windsor & Eton Riverside on Sunday 2 November 2008

Routes affected: London Waterloo, Clapham Junction, Putney, Barnes, Richmond, Twickenham, Hounslow, Whitton & Feltham, Ashford, Staines & Wraysbury & Windsor & Eton Riverside / Chertsey & Weybridge / Ascot

Buses replace trains between:

  • Hounslow and Windsor & Eton Riverside
  • Hounslow and Ascot
  • Hounslow and Weybridge

All journey times will be considerably extended.

To get options for your journey, please use the Journey Planner

 

 

Start: 08/11/2008 End: 09/11/2008

Engineering work between Southampton Central and Bournemouth on Sautrday 8 and Sunday 9 November 2008

Routes affected: Manchester Piccadilly / Crewe / Birmingham New Street, Coventry, Banbury, Oxford, Basingstoke, Southampton Central & Bournemouth

CrossCountry

Trains will start / end at Southampton Central. Buses will replace trains between Southampton Central and Bournemouth.

South West Trains

Buses will replace trains between Southampton Central and Brockenhurst and between Southampton Airport Parkway and Bournemouth.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 08/11/2008 End: 09/11/2008

Engineering work between Taunton and Exeter St Davids on Saturday 8 and Sunday 9 November 2008

Routes affected: Birmingham New Street, Cheltenham Spa, Gloucester, Bristol Temple Meads, Taunton, Tiverton Parkway, Exeter St Davids & Paignton / Plymouth

First Great Western

Buses replace trains between Taunton and Exeter St Davids.

CrossCountry

Buses replace trains between Gloucester and Birmingham New Street.

South West Trains

A reduced service will run between Yeovil Junction and Exeter St Davids.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 09/11/2008 End: 09/11/2008

Engineering work at Bath Spa Station on Sunday 9 November 2008

Routes affected: London Paddington, Reading, Swindon, Bath Spa, Bristol Temple Meads, Taunton & Exeter St Davids and Cardiff / Gloucester, Bristol Temple Meads, Bath Spa, Westbury & Southampton Central / Weymouth

First Great Western

Buses replace trains between;

  • Bristol Temple Meads and Swindon via Bath Spa
  • Bristol Temple Meads and Westbury via Bath Spa
  • Swindon and Westbury via Melksham

Due to limited road access to Bath Spa station the replacement buses will not serve Bath Spa railway station.

Buses will pick up from a temporary bus station located near the junction of Avon Street and Green Park Road, which is close to the city centre. This is approximately 15 minutes walk from Bath Spa railway station.

Directions to the temporary rail replacement bus station will be published nearer the time.

South West Trains

Buses replace trains between Westbury and Bristol Temple Meads.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 09/11/2008 End: 09/11/2008

Engineering work between Wimbledon and Dorking / Effingham Junction until 12:20 on Sunday 9 November 2008

Routes affected: London Waterloo, Clapham Junction, Wimbledon & Chessington South / Effingham Junction / Dorking and London Victoria, Clapham Junction, Mitcham Junction, Sutton, Epsom, Leatherhead, Dorking & Horsham and London Victoria, Balham, Stratham Common, West Croydon, Sutton & Epsom Downs

South West Trains

Buses replace trains between:

  • Wimbledon and Dorking
  • Wimbledon and Chessington South 
  • Wimbledon and Effingham Junction via Epsom

Southern

Buses replace trains between Streatham Common and Dorking

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 15/11/2008 End: 16/11/2008

Engineering work between Staines and Windsor & Eton Riverside on Saturday 15 and Sunday 16 November 2008.

Routes affected: London Waterloo, Clapham Junction, Putney, Barnes, Richmond, Twickenham, Whitton, Feltham, Ashford, Staines, Wraysbury, Sunnymeads, Datchet, Windsor & Eton Riverside

Buses will replace trains between Staines and Windsor & Eton Riverside, with journey times extended by up to 30 minutes

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 15/11/2008 End: 16/11/2008

Engineering work between Bridgwater / Taunton and Exeter St Davids on Saturday 15 and Sunday 16 November 2008

Routes affected: Bristol Temple Meads, Weston-super-Mare, Highbridge & Burnham, Bridgwater, Taunton, Tiverton Parkway, Exeter St Davids & Paignton / Plymouth and London Paddington, Reading, Taunton, Tiverton Parkway, Exeter St Davids, Totnes, Plymouth, Par & Penzance

First Great Western

Saturday

From 22:45 buses will replace trains between Weston-super-Mare and Exeter St Davids and between Highbridge & Burnham and Exeter St Davids.

Sunday

Buses replace trains between Taunton and Exeter St Davids.

CrossCountry

Buses replace trains between Taunton and Exeter St Davids.

South West Trains

A reduced service will run between Yeovil Junction and Exeter St Davids.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 16/11/2008 End: 16/11/2008

Engineering work at Bath Spa Station on Sunday 16 November 2008

Routes affected: London Paddington, Reading, Swindon, Bath Spa, Bristol Temple Meads, Taunton & Exeter St Davids and Cardiff / Gloucester, Bristol Temple Meads, Bath Spa, Westbury & Southampton Central / Weymouth

First Great Western

Buses replace trains between;

  • Bristol Temple Meads and Swindon via Bath Spa
  • Bristol Temple Meads and Westbury via Bath Spa
  • Swindon and Westbury via Melksham

Due to limited road access to Bath Spa station the replacement buses will not serve Bath Spa railway station.

Buses will pick up from a temporary bus station located near the junction of Avon Street and Green Park Road, which is close to the city centre. This is approximately 15 minutes walk from Bath Spa railway station.

Directions to the temporary replacement bus station will be published nearer the time.

South West Trains

It is not yet known how South West Trains are affected by this engineering work

Start: 16/11/2008 End: 16/11/2008

Engineering work between London Waterloo and Surbiton / Dorking on Sunday 16 November 2008

Routes affected: London Waterloo, Clapham Junction, Wimbledon, Surbiton, Epsom & Kingston / Chessington South / Dorking.

Buses replace trains between:

  • Clapham Juntion and Surbiton
  • Clapham Junction and Effingham Junction via Surbiton
  • Clapham Junction and Weybridge
  • Clapham Junction and Hampton Court
  • Clapham Junction and Kingston
  • Kingston and Woking via Surbiton
  • Leatherhead and Dorking.

Planning your journey

To get options for your journey, please use Journey Planner

 

Start: 22/11/2008 End: 23/11/2008

Engineering work between Staines and Windsor & Eton Riverside on Saturday 22 and Sunday 23 November 2008.

Routes affected: London Waterloo, Clapham Junction, Putney, Barnes, Richmond, Twickenham, Whitton, Feltham, Ashford, Staines, Wraysbury, Sunnymeads, Datchet, Windsor & Eton Riverside

Buses will replace trains between Staines and Windsor & Eton Riverside, with journey times extended by up to 30 minutes.

Passengers should leave Windsor & Eton Riverside 18 minutes earlier to maintain connections at London Waterloo

Planning your Journey

To get options for your journey, please use  Journey Planner

Start: 22/11/2008 End: 23/11/2008

Engineering work between Bridgwater and Exeter St Davids on Saturday 22 and Sunday 23 November 2008

Routes affected: Birmingham New Street, Cheltenham Spa, Gloucester, Bristol Temple Meads, Taunton, Tiverton Parkway, Exeter St Davids & Paignton / Plymouth and London Paddington, Reading, Taunton, Exeter St Davids, Newton Abbot, Plymouth, Par & Penzance; also London Waterloo, Basingstoke, Salisbury, Yeovil Junction, Honiton, Exeter Central & Exeter St Davids; also Bristol Temple Meads, Bedminster, Nailsea & Backwell, Yatton, Weston-Super-Mare, Highbridge & Burnham, Bridgwater & Taunton

Saturday

First Great Western

Buses replace trains between Taunton and Exeter St Davids

From 22:45 buses will replace trains between Weston-Super-Mare and Exeter St Davids and between Highbridge & Burnham to Exeter St Davids

CrossCountry

Buses replace trains between Taunton and Exeter St Davids

South West Trains

A reduced train service will run between Yeovil Junction and Exeter St Davids

Sunday

Buses will replace trains between Taunton and Exeter St Davids

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 22/11/2008 End: 23/11/2008

Engineering work between Southampton Central and Brockenhurst on Saturday 22 and Sunday 23 November 2008

Routes affected: Birmingham New Street, Coventry, Oxford, Reading, Basingstoke, Southampton Central, Brockenhurst & Bournemouth and London Waterloo, Basingstoke, Winchester, Southampton Airport Parkway, Southampton Central, Brockenhurst, Bournemouth, Poole & Weymouth

CrossCountry

Buses will run between Southampton Central and Bournemouth. 

South West Trains

Buses replace trains between:

  • Southampton Central and Brockenhurst
  • Southampton Airport Parkway and Bournemouth

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 23/11/2008 End: 23/11/2008

Engineering work between New Malden and Strawberry Hill on Sunday 23 November 2008

Routes affected: London Waterloo, Clapham Junction, Wimbledon, Raynes Park, New Malden, Kingston, Strawberry Hill / Shepperton

Buses replace trains between New Malden and Strawberry Hill / Shepperton

Planning your Journey

To get options for your journey, please use the Journey Planner

 

Start: 29/11/2008 End: 30/11/2008

Engineering work between Guildford and Haslemere on Saturday 29 and Sunday 30 November 2008

Routes affected: London Waterloo, Clapham Junction, Woking, Guildford, Haslemere, Havant, Fratton & Portsmouth Harbour

Buses replace trains between Guildford and Haslemere.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 29/11/2008 End: 30/11/2008

Engineering work between Staines and Windsor & Eton Riverside on Saturday 29 and Sunday 30 November 2008

Routes affected: London Waterloo, Clapham Junction, Richmond, Feltham, Staines, Wraysbury, Sunnymeads, Datchet & Windsor & Eton Riverside

Buses replace trains between Staines and Windsor & Eton Riverside.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 30/11/2008 End: 30/11/2008

Engineering work between Southampton Central and Brockenhurst on Sunday 30 November 2008

Routes affected: London Waterloo, Clapham Junction, Woking, Basingstoke, Winchester, Eastleigh, Southampton Central, Brockenhurst, Bournemouth, Poole & Weymouth and Birmingham New Street, Coventry, Leamington Spa, Oxford, Reading, Basingstoke, Southampton Central, Brockenhurst & Bournemouth

CrossCountry

Buses replace trains between Southampton Central and Brockenhurst / Bournemouth.

Details of revised timetables have not yet been confirmed, please check back nearer the time of travel

South West Trains

Buses replace trains between Southampton Central and Brockenhurst.

Planning your Journey

To get options for your journey, please use the Journey Planner

Start: 30/11/2008 End: 30/11/2008

Engineering work between Ascot and Guildford until 15:50 on Sunday 30 November 2008

Routes affected: London Waterloo, Clapham Junction, Richmond, Staines, Ascot, Ash Vale & Guildford and London Waterloo, Surbiton, Woking, Ash Vale, Aldershot & Alton

Buses replace trains between Ascot and Guildford and Woking and Alton.

Planning your Journey

To get options for your journey, please use the Journey Planner

Back to top